First LNG tank roof lifted

The Ichthys LNG Project has safely lifted a 90 metre span steel roof structure for the first of its LNG cryogenic storage tanks. The 1100 tonne structure was constructed on the tank floor and then raised into place over a four hour period using two powerful fans.

Back to Video articles