Environmental Documents

Construction Environmental Management Plan Rev 9

To support the Environmental Protection Approval (EPA7 – as amended), Construction Environmental Management Plans have been developed by the onshore LNG facility contractor, which provide information regarding the onshore construction activities and the associated management measures for potential environmental impacts during these activities. The CEMP is regularly updated and approved to remain current. Revision 0 was developed for the initial construction activities. Revision 4 was updated to generally provide detail on wet season management measures. Revision 7 was updated to include new packages of work. Revision 9 was updated to reflect new approvals and to incorporate errata. Note that intermediate revisions (between Revision 0, Revision 4, Revision 7 and Revision 9) were for internal revision and approval procedures.

Download this document [39295 KB]

 




Addendum 1 to the Onshore CEMP

Addendum 1 to the Onshore CEMP outlines the potential environmental impacts and mitigation measures related to geotechnical investigations in the nearshore environment of Blaydin Point.

Download this document [12191 KB]

 

Addendum 2 to the Onshore CEMP

Addendum 02 to the Onshore CEMP outlines an additional method of ground improvement, to be deployed at the Module Offloading Facility causeway. It should be read in conjunction with the Onshore CEMP.

Download this document [3293 KB]

 

Coastal Offset Strategy (Commonwealth Government)

INPEX is required to develop a Coastal Offset Strategy to meet Condition 11 of the Commonwealth environmental approval document, EPBC Approval Decision 4208/2008. The Coastal Offset Strategy outlines INPEX’s commitment to a number of environmental offset programs, which are designed to counterbalance the potential impacts of the Ichthys Project and help achieve long-term conservation outcomes.

Download the Coastal Offset Strategy [689 KB]

 

Traffic Management Plan

The aim of this document is to set out an all encompassing plan for the management of road traffic on public roads associated with the construction of the Ichthys Onshore LNG Facilities and its interface with other parts of the Ichthys Project not part of this scope (e.g. offshore works) and other road users.

Download this document [10239 KB]

 

Dredging and Spoil Disposal Management Plan - East Arm Revision 4

The Dredging and Spoil Disposal Management Plan outlines INPEX's management and monitoring of the dredging program for the East Arm navigation channel, turning pockets and approach apron, and associated spoil disposal. Previously approved addenda to this DSDMP have been incorporated into this current version.

Download this document [16992 KB]

 

Nearshore Environmental Monitoring Plan Revision 4 (NEMP)

This Nearshore Environmental Monitoring Plan (NEMP) describes how monitoring of potential environmental impacts arising from the dredging and disposal activities in the nearshore development area of Darwin Harbour will be undertaken prior to, during and post construction phases of the Ichthys Project. Previously approved addenda to this NEMP have been incorporated into this current version.

Download this document [9090 KB]

 

Ichthys Project Dredging Marine Transport Management Plan

This Marine Transport Management Plan (MTMP) has been produced by Van Oord Australia Pty Ltd (Contractor) and is applicable to the works performed under the Darwin Harbour Dredging Works for Onshore Facilities contract (the Contract) with INPEX Operations Australia Pty Ltd (Company) forming part of the Ichthys Gas Field Development Project (the Project).

Download this document [1913 KB]

 

Gas Export Pipeline Dredging & Spoil Disposal Management Plan

The GEP Dredging and Spoil Disposal Management Plan (DSDMP) outlines INPEX’s management and monitoring of the dredging program for the Gas Export Pipeline route in Darwin Harbour and associated spoil disposal. This plan has been amended to include a small amount of additional dredging.

Download this document [34637 KB]

 

GEP Nearshore/Onshore Construction and Environemnt Management Plan Rev 1

To support the Environmental Protection Approval (EPA12), this construction Environmental Management Plan (CEMP) details the environmental protection management measures and controls necessary to avoid, reduce or mitigate potential environmental impacts that may occur during the installation of the gas export pipeline in the nearshore (i.e. within NT coastal waters, including Darwin Harbour) and onshore area.

Download this document [16880 KB]

 

You will need Adobe Acrobat Reader to view these documents.

Download EIS Supplement here.

Download Draft Environmental Impact Statement here.

Download EIS Supplement Technical Appendices here.

 

 


Website Design by Clarity Communications