Documentation

Environment Protection Approval EPA7-2 (NT Government)

INPEX has been granted an environment protection approval (EPA7) under the Waste Management and Pollution Control Act (NT) for construction of the onshore LNG facility. EPA7 has been amended to reflect a change in the emergency contact person details, and is reissued as EPA7-2.

Download this document [3181 KB]

 

Ichthys LNG Plant Development Permit

A Development Permit was granted under the Planning Act for the Ichthys Project Plant Site on Middle Arm. This permit provides consent for the development of the LNG processing plant subject to conditions.

Download this document [51161 KB]

 

Development Permit - DP11/0775

To use and develop the land for the purpose of dredging within Darwin Harbour to facilitate a gas pipeline and module offloading facility, in accordance with the attached schedule of conditions and the endorsed plans.

Download this document [873 KB]

 


Development Permit 11/0775A – MOF dredging

Grants consent to vary Development Permit DP11/0775 for the purpose of separating the two dredging components and allowing the submission of separate corresponding Dredging and Dredge Spoil Environmental Management Plans for the Modular Offloading Faciltiy and Gas Export Pipeline.

Download this document [119 KB]

 

Environment Protection Approval EPA8-1 (NT Government)

INPEX has been granted an environment protection approval (EPA8) under the Waste Management and Pollution Control Act (NT) for dredging of the East Arm navigation channel, turning pockets and approach apron, and associated spoil disposal. EPA8-1 has been amended to reflect an approved change to the dredging design and new emergency contact details.

Download this document [8912 KB]

 


DP12/0297B

DP12/0297B provides planning approval for the additional dredging required for the enlarged seawater intake pit located just to the NNW of Blaydin Point, Darwin.

Download this document [683 KB]

 





Environment Protection Approval (EPA9) for GEP DSDMP

INPEX has been granted an Environment Protection Approval (EPA9) under the Waste Management and Pollution Control Act (NT) for conduct of dredging in the Gas Export Pipeline route in Darwin Harbour.

Download this document [4244 KB]

 

Environment Protection Approval EPA 12 (NT EPA)

INPEX has been granted an Environmental Protection Approval (EPA 12) under the Waste management and Pollution Control Act (NT) for installation of the gas export pipeline and construction of onshore/nearshore facilities.

Download this document [3928 KB]

 

You will need Adobe Acrobat Reader to view these documents.
Extraordinary Careers Being Here

Website Design by Clarity Communications